移动端
微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试
首页
词条
drilling
Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().
A drilling bit which is doughnut shaped to permit recovery of the center portion of the hole drilled is called a().