移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

多选题

A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()

发布日期:2020-04-11

A new switch is being installed and you have been ...
A

You must set each end of the trunk line to IEEE 802.1e encapsulation.

B

You must set the same VTP management domain name on both switches.

C

You must set all ports on the two switches as access ports.

D

You must configure one of the switches as a VTP server.

E

You must use a rollover cable to connect the two switches.

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

CMS专题

CMS专题

去刷题
热门试题热门资讯 相关试题

暂无相关推荐~