单选题 A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()
Sum of SPECfp values
Sum of rPerf values only
Sum of rPerf and ROLTP values
Sum of SPECint and SPECjbb values
单选题 A customer has a p650 on order and plans to put it in a current OEM rack. They are concerned that the p650 power supply may demand more current than the OEM PDU can provide. Which planning guide specification would provide the necessary requirements?()
Voltage
Frequency
Power Source Loading (max)
Power Source Loading (typical)
单选题 A customer’s new rack contains 12 x p655 servers. The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s. What upgrades, if any, are needed to the HMC to support the new p655 servers?()
No upgrades are needed.
Add another 16-port RAN.
Add an 8-port async adapter.
Add an additional 128-port adapter.
单选题 A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
Are there any errors in the error log? Do they indicate any hardware or software errors?
Has performance data been collected? What do the results show in terms of I/O statistics?
Has performance data been collected? What do the results show in terms of CPU utilization?
What type of SAN switch is the customer using? What are the microcode levels on the switch?
单选题 A pSeries technical specialist has completed a server consolidation study of a customer’s environment. An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload. What is the most appropriate next step?()
Update Siebel to include the study results.
Review the study results and LPAR worksheet with the customer.
Design detailed system configurations around the study results.
Work with the client executive and the brand manager to establish discounts.
单选题 A customer is ready to place an order for a p5-570 Express. The external storage proposed for this solution is a 1TB FAStT600 storage server. The customer now wishes to attach a SCSI LTO-2 tape drive to the server to enable them to backup their data. Which of the following should the pSeries technical specialist recommend for the tape drive?()
Add a PCI-X Dual Channel Ultra320 SCSI Adapter (FC 5712).
Add a PCI-X Fibre Channel Adapter (FC 5716).
Add the optional External SCSI Port Enablement Cable (FC 4273).
Use the integrated external SCSI port on the p5-570 Express server.
单选题 A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
Two p670 servers
Four p650 servers
Two p5-570 servers
Four p5-550 servers
单选题 A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
单选题 When should Solutions Assurance Reviews take place?()
Pre-order, pre-installation
Post-order, pre-installation
Pre-order, post completion sign-off
Pre-installation, post completion sign-off
下列属于直线行驶的是()
某通信机房设置七氟丙烷预制灭火系统,该系统应有( )种启动方式。
唐后期书院产生的一个原因是受到()的影响。
压力损失是指()
干旱区造林,整地的主要目的是()
治癫证痰气郁结证,治以()
小学低、中年级的儿童____识记发展最为迅速。
( )是北京市制定的第一个全面保护历史文化名城的法规。
安全带的正确使用:使用前作外观检查,若破损应()使用。
Your network consists of a single Active Directory domain. The domain contains more than 300 group objects. The group objects are divided between several regional organizational units (OUs). You need to create a list of all groups that have names that begin with the word Sales. Which command should you use? ()