单选题 Who is responsible for authorizing closure of the project?()
Project Manager
Stakeholder
Customer
Executive Sponsor
单选题 The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()
There are discolored ceiling tiles near the middle of the room.
Large amounts of dust have accumulated in the corners of the room.
The anti-static carpet has been removed resulting in a bare painted concrete floor.
A wet pipe water-based sprinkler system has been installed above the racks.
单选题 After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()
replace the NIC
install the latest SSU (System Setup Utility) version
upgrade the firmware on the NIC
assign the NIC a static IRQ in the SSU (System Setup Utility)
单选题 What is a reason for reviewing the user requirements document with the client?()
To gain the client’s acceptance of the detailed design
To verify mutual understanding of project resources
To verify mutual understanding of the detailed project plan
To verify mutual understanding of targeted product performance
To verify mutual understanding of the tests that will be done after the product is completed
单选题 A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()
RAID
tape library
optical storage
disk to disk to tape
单选题 What is the role of the line manager in a project plan?()
Provide resources to a project
Request requirements changes
Resolve team conflicts
Control the project budget
单选题 Why does a project manager need an executive sponsor?()
To keep the project team focused on its work
To provide behind-the-scenes assistance with organizational commitment and support
To sign-off on user requirements
To negotiate contracts with outside vendors
单选题 As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()
Up to 5
Up to 10
Up to 15
Up to 20
单选题 Which throughput does a 33 MHz, 33-bit bus have?()
132 Mbps
256 Mbps
264 Mbps
450 Mbps
单选题 Acceptance of deliverables to multiple locations requires which type of sign off?()
Design Acceptance
Code Acceptance
Module Acceptance
Site Acceptance
公文的发文闭合程序?
初始评审的目的是为职业安全健康管理体系建立和实施提供基础,为职业安全健康管理体系的持续改进( )。
抗体是由下列哪种细胞产生的()
营业外收入是指企业发生的与其日常活动无直接关系的利得。
对于PowerPoint2003中文本框内的文字,设置项目符号可以采用的是()。
牵引装置的分类,可分为()。
USB是并行、串行数据传输模式之外的第3种传输模式。
足月新生儿,出生体重2.3kg,羊膜早破,生后2天拒奶,呕吐,发绀,黄疸进行性加重。体检:体温不升,前囟平,颈软,全身黄染,心率150次/分,心音及心率正常,腹软,肝肋下3cm。化验:白细胞20×109/L,中性粒细胞占80%,胆红素308μmol/L,血型“O”,母亲血型为“A”,最大可能是()
引起肾盂肾炎最常见的致病菌是( )。
女性患者,54岁,劳动中突感头晕,随即左半身无力,右眼闭合不全,双眼向左侧凝视,10分钟后昏迷。高热、双瞳孔小、四肢软瘫,应考虑的诊断是()