In the M-Emooring trial, the starting trial is carried under()
()does not belong to the mooring trial item.
After repair, the voyage trial of the M-E should be done ()
When carrying out the voyage trial, the M-E is not necessary to take()trial.
When carrying out mooring trial, the () trial of the MEis not necessary.
According to the regulation of the voyage trial on new ship,()is one of the trial items of the UMS ship bridge control.
During sea trial, the main engine well be kept run at load()
In the M-Emooring trial, the starting trial is carried under()
When carrying out the voyage trial, the M-E is not necessary to take()trial.
临床试验(clinical trial)