This was disaster on a cosmic scale.
A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()
A new Disaster Recovery site has been established using Metro Mirror to hold synchronous data at both sites. After the Metro Mirror is started, one of the most important applications, a DB2 database, slows down. An analysis shows that the I/O rate (especially write I/Os) is less than 40% compared to the former rates. What is the best explanation for this behavior()
A Site Administrator is preparing for disaster recovery. In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()
Which of the following is necessary in a disaster preparedness plan?
Which of the following is necessary in a disaster preparedness plan?
Which of the following is MOST important to include on the disaster recovery documentation?()
A company has just implemented a disaster recovery plan in which critical business must be restored in a four hour window. Which of the following methods should be used to backup theservers?()
In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()