单选题
某工程双代号网络计划如图所示,其中E工作的最早开始时间和最迟开始时间是( )。
发布日期:2021-03-12
3和5
3和6
4和5
4和6
标签: "暂无标签"
题王网让考试变得更简单
扫码关注题王,更多免费功能准备上线!
此试题出现在
其他考试
日晷是利用太阳的投影和地球自转的原理,借指针所生阴影的位置来显示时间。我国在( )时期就已广泛应用。
提出“隐含的读者”的概念,开启了接受美学由接受研究向效应研究的内在转变的是()
Refer to the exhibit. Router B and router C are performing mutual redistribution between OSPF and EIGRP, and their default metrics are configured the same. Router D has equal cost paths to networks where both paths are not r eally equal cost. For example, network 172.16.54.0 shows equal cost through both router B and router C, though in reality the cost is greater using router C. Other routers, though not shown, are connected to the 172.16.54.0 and 172.16.55.0 networks, and the same issues exist to those routers and the networks connected to them. What can be done so that data will be routed along the most optimal path in the network? ()
ADI是指()
车站值班员如需取消发车进路时,应先()。
外汇期货是属于远期外汇交易的一种。( )
灌木
讲述银行业监督管理的目标、职责及应遵循的原则。
____是学生最主要的权利。
过冷度
2022年监理工程师职业资格考试准考证打印入口
关于暂停举办广东考区2022年度监理工程师职业资格考试通告
2022年度全国监理工程师职业资格考试张掖考区考生疫情防控须知
自贡市人事考试评价中心关于2022年度全国监理工程师职业资格考试期间疫情防控注意事项的公告
如何提高监理工程师考前的复习质量?
如何提高监理工程师考试通过率?
监理工程师有哪些专业?
2022年度广东省监理工程师职业资格考试报考须知
四川省人事考试中心关于做好2022年度监理工程师职业资格考试考务工作的通知
2021年监理工程师人工审核通过资格证书发放通知