多选题
发布日期:2022-07-15
Open the Set Priority panel from the job properties.
Change the priority of the job stream that contains the job.
Select the corresponding action from the Monitor jobs task panel.
Open the job stream properties and drill down to the job priority panel.
The priority of a job can only be changed from the Workload Designer.
标签: "暂无标签"
题王网让考试变得更简单
扫码关注题王,更多免费功能准备上线!
此试题出现在